DECK GUARD POST ATTACHMENT: WHY MOST FAIL INSPECTION

YOU CAN MEET EVERY GUARD RULE AND STILL FAIL Deck guard post attachment under the IRC is often misunderstood in the field. If the walking surface is more than 30 inches above grade, a guard is required. The code establishes the dimensional requirements—height and opening limitations. Those are the visible parts of the code. But … Read more

Deck Lateral Load Connection Requirements (IRC R507.9.2): What Inspectors Actually Look For

Why This Matters in the Field Deck lateral load connection requirements under IRC R507.9.2 are one of the most commonly misunderstood inspection items in the field. Most installers focus on the ledger attachment and assume that once it is properly fastened, the structural connection to the house is complete. The IRC does not treat it … Read more